Skip to content
MOROBEST
Critical Path

Critical Path

The engineering journey to Starship and beyond.

10.02026

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Release2026-07-10
Runtime34 min
StatusReleased
Original languageEN
SpokenEnglish
Votes1
Popularity1
TMDB ID1730940

Cast

Images

Recommended

Movie & TV metadata from TMDB. This product uses the TMDB API but is not endorsed or certified by TMDB.